icon-arrow icon-facebook icon-linkedin icon-mail icon-mail-company icon-phone icon-twitter icon-whatsapp icon-share icon-link icon-download icon-youtube icon-flickr icon-search icon-close icon-filter icon-round-close icon-vcard paper-plane icon-footprint icon-faq icon-maps Vimeo
Tetouan, Morocco

Construction of a wastewater pipeline

As part of the construction of a wastewater pipeline, Visser & Smit Hanab has installated a 275 m long OD 1200 mm PE-HD waste water line under the river Martil near Tétouan in Morocco.   The HDD river crossing was executed with a 250 ton drill rig.

DrillRig
250 ton
Material
PE
Diameter
1200 mm
Length
275 meter