icon-arrow icon-facebook icon-linkedin icon-mail icon-mail-company icon-phone icon-twitter icon-whatsapp icon-share icon-link icon-download icon-youtube icon-flickr icon-search icon-close icon-filter icon-round-close icon-vcard paper-plane icon-footprint icon-faq icon-maps Vimeo
Szeged, Hungary

Crossing of River Tisza

As part of the interconnector gas pipeline between Hungary and Romania, Visser & Smit Hanab was selected to cross the Tisza River by means of an HDD.

DrillRig
250 ton
Material
Steel
Diameter
40"
Length
1310 meter

As an alternative for dredging, reducing the environmental impact, Visser & Smit Hanab installed a 40" steel gas pipeline by means of an HDD over a length of 1310 meters.