icon-arrow icon-facebook icon-linkedin icon-mail icon-mail-company icon-phone icon-twitter icon-whatsapp icon-share icon-link icon-download icon-youtube icon-flickr icon-search icon-close icon-filter icon-round-close icon-vcard paper-plane icon-footprint icon-faq icon-maps Vimeo
Agadir, Morocco

Oued River Crossing

Visser & Smit Hanab was contracted for the crossing of the Oued river as part of the construction of a wastewater pipeline.    A 250 ton drill rig was used for the 370 meter river crossing of the 1200 mm PE pipeline.    

DrillRig
250 ton
Material
HDPE
Diameter
1200 mm
Length
300 meter