Palm Jumairah, Dubai

Palm Jameirah HDD's

Visser & Smit Hanab was contracted to design, engineer, supply, install, test & commission the 11kV Prysmian submarine cable to Logo Island.

DrillRig
250 ton
Soil
Rock
Material
PE
Diameter
250 mm
Length
4 x 600 meter

To connect the Island to the mainland, 4 horizontal directional drillings were needed. The 600 meter long crossings were drilled from the mainland to the island using a 250 ton rig. 4x PE 250mm pipelines were pulled in to provide the cableduct.