![Afbeelding1.jpg](/sites/vw_vs_hanab_drilling/files/styles/content_keyvisual_parallax_large_xsmall/public/webcomposer/5769--Afbeelding1.jpg?h=fff5d2cc&itok=mSP7mc0G)
Crossing of River Tisza
As part of the interconnector gas pipeline between Hungary and Romania, Visser & Smit Hanab was selected to cross the Tisza River by means of an HDD.
As an alternative for dredging, reducing the environmental impact, Visser & Smit Hanab installed a 40" steel gas pipeline by means of an HDD over a length of 1310 meters.