![qatar 2.jpg](/sites/vw_vs_hanab_drilling/files/styles/content_keyvisual_parallax_large_xsmall/public/webcomposer/5782--qatar%202.jpg?h=96efebf1&itok=lmL_XaRx)
Seven HDD's in Qatar
Visser & Smit Hanab was contracted by a large cable contractor to design and install the Doha cable landings by means of 7 Horizontal Directional Drillings.
The seven HDD’s were performed with a 100 ton drill rig. The length of the drillings were aproximately 135 meter per drilling with a diameter of Ø450mm.