HDD - Heating Network Stora Enso (B)
Construction of a heating pipe that transports waste heat from the Stora Enso paper manufactury to car manufacturer Volvo. This pipeline has a length of 3,4 kilometres and includes a horizontal directional drilling of 450 metres under the Ghent -Terneuzen channel. TV-report of the AVS (Eastern Flanders Television).
![Stora Enso IMG-20160313-WA0003.jpg](/sites/vw_vs_hanab_drilling/files/styles/content_keyvisual_parallax_xsmall/public/webcomposer/5949--Stora%20Enso%20IMG-20160313-WA0003.jpg?h=3a6c704d&itok=etN_Tmx3)