icon-arrow icon-facebook icon-linkedin icon-mail icon-mail-company icon-phone icon-twitter icon-whatsapp icon-share icon-link icon-download icon-youtube icon-flickr icon-search icon-close icon-filter icon-round-close icon-vcard paper-plane icon-footprint icon-faq icon-maps Vimeo

HDD - Relocation of pipelines

In preparation of the future modification to the bridges across the Albertkanaal, a channel which runs through Belgium between Luik and Antwerp, Visser & Smit Hanab was commissioned by Petrochemical Pipeline Services for the relocation of the existing pipelines, which included the execution of two Horizontal Directional Drillings (HDD’s).

For more information about this project please click here.